Responsibilities includes: mapping, database management, field work, and alternative development (calculating how much flow goes into a UIC and performing the early stages of design). The Category 3 UIC project was to perform corrective actions to fix UIC (sumps) that are sitting in groundwater or within 5’ of the groundwater table.